Categories
Uncategorized

No More Construction Photos 1-02-96

MONSTEROUSLY MIXED MARKS. MAKES ME MOROSE. MOSTLY MENTALLY MASHING MYSELF.

The Clachan foreman says he hopes to be doingthe absolute last bits on the site on Saturday. If the weather is toocold it will stop him working on stuff, and will delay things a bitfurther.

The temporary signs will be finished on Tuesday 7th and installed…I don’t know when or by whom. I’d do it myself that afternoon if I could.

I don’t know what else the Parks’ manager will require to open it up for use.

Hang tough.

I appologise again, mainly for the steepest banked bit leading into the wallride.

Itwas my fault for not watching the last official drawings closelyenough, and then the contractors had to make things up off a badengineering plan with bad numbers.
It’s tweaked wrongly and the transitions should have been made much bigger and friendlier. Damn damn damn.

The buck stops with me though, and I am really sorry.

Few other wee bits and bobs that aren’t quite right, but they’re fairly minor.

The wallride itself is fun though!

😉