Categories
Uncategorized

4-10-05 Construction Photos

Not too much more to see here, but I’ve streched it as far as I could 🙂

Here’s the mini street drop… the bank will be mainly 20degrees at about 550mm high. In case you are wondering; that crowbar isNOT at the correct angle, it’s just there.

Iconfirmed the fact that the mesh for the wallride was still to beextended upwards. Apparently those panels are 2.4 meters wide, so thereis another 600mm still to go on top. As roughly indicated by thislovely blue line. The outer corner will be rounded though.

They will do the pour in two stages, to get the right height. Sez ’The Dude Onsite.’

Lookingover the street slab/wallos platform. You can see the amount that theKeyhole has got to be scooped back to; Those guys are standing eitherside of the edge of the platform that they are pouring next.

That edge again…

Think of the reef hip-bump at Perth, then make it bigger and moreblast-over-able. same big roll-over lip for ease of landing. See modelon ’Plans’ page.

er…